Work & Experience
Improvement of Dharkhar to Sarail as 4-lane National Highway Project. Responsible for construction supervision & quality control of roads, culverts / bridges, growth centers, drains, water supply and sanitation system, Landing ramp through laboratory tests and on site tests, Period survey etc. Prepare design and cost estimates of roads, bridges/culverts etc.
Responsible for monitoring of all site works & checking of field layout with comparison of approved estimate lay-out drawing. Jointly collect the materials from site and testing jointly in the site laboratory.
Responsible for estimate Checking & preparation of Greater Faridpur Rural Infrastructure Development Project (GFRIDP-2). Estimate preparation use RSEPS software as per design & check Contribute to nalizing standard designs and technical specications for project civil works to establishing effective construction methods and to dening procedures for systematic laboratory and on-site testing and checking of quality of works including reporting procedures and corrective measures. Inspect the existing LGED laboratories and dene any additional equipment requirements and improvements in operational procedures and strong to meet project needs.
Responsible construction of R.C.C boundary wall Installation of 500 KVA Transformer with HT Panel ad LT Panel Board, External & Internal Electrication works, sinking of deep tube well and water supply system, 50,000 Gallon Capacity Overhead Water Tank and site Development works.